Rock Crusher

The Rock Crusher project is an ongoing ACCI operation that began in 2018. This operation can produce various sizes and forms of usable stone from blasted or excavated rock, concrete rubble, and brick. What is unique about this operation is its mobility. It can be mobilized to a project that has existing rock or concrete …

Rock Crusher Read More »

Crosswinds

The Crosswinds project is a commercial development on Highway 431 in Phenix City, Alabama that began in 2018. This development is a product of Crossland Construction. ACCI has completed the sitework for this project which included the following: Site Clearing of 30 acres 286,000 cubic yards of dirt moved on site Underground Utility Systems totaling …

Crosswinds Read More »

Academy

The Academy project was a commercial retail development by T.D. Farrell in Columbus, Georgia and was completed in 2018. ACCI completed the sitework scope package for this project which included but is not limited to the following: Site Clearing of 6 acres 66,785 cubic yards of dirt moved on site Underground Utility Systems with approx. …

Academy Read More »

Cooper Creek Tennis Facility

Cooper Creek Tennis Facility is a 27 court and clubhouse addition developed by Brasfield & Gorrie in Columbus, Georgia in 2016. ACCI completed the sitework scope package which included but was not limited to the following: Graded 23 full size tennis courts and 4 junior courts Installed 5,200 square yards of sidewalk Underground Utility Systems …

Cooper Creek Tennis Facility Read More »

Fire Tower Road

The Fire Tower Road project was a remediation development of an old landfill for Chattahoochee County in 2016. remediation of old landfill, removal of concrete debris, regrading of slope to prevent contamination and erosion, installed storm sewer system and methane observation system Acting as the primary contractor, ACCI executed the sitework scope which included but …

Fire Tower Road Read More »

Forrest Road Improvements

Forrest Road Improvements was a road widening project that transformed a 2 lane road into a 3 lane road in 2016 for Columbus Consolidated Government. As the Prime Contractor, ACCI performed the following for the 2 mile widening project: Placed over 20,000 tons of graded aggregate base Replaced all water connections to over 100 homes …

Forrest Road Improvements Read More »

Richland Road Elementary School

The Richland Road Elementary School project in Auburn, Alabama was developed by Bailey-Harris Construction in 2018. ACCI has completed the sitework scope package which included but is not limited to the following: Site Clearing of 15 acres 75,200 cubic yards of dirt moved on site Fine Grading 22,500 square yards for school pad, paving, curb …

Richland Road Elementary School Read More »

H&K

The H&K project is a production plant for the firearms manufacturer, Heckler & Koch. Developed in 2016 by Freeman and associates, this facility is located in Columbus, Georgia. ACCI completed the sitework scope package for this project which included but is not limited to the following: Site Clearing of 11.5 acres 80,000 cubic yards of …

H&K Read More »