St. Francis

The St. Francis project consisted of the demolition of the parking lot, new construction of parking lot, and reconstruction of the existing underground detention system. 

ACCI completed the sitework scope package which included but was not limited to the following:

  • Base & Paving totaling 4,766 SY
  • 1,055 LF of Curb & Gutter
  • Underground Utility Systems totaling 555 LF of 54’’,42’’,24’’, and 18’’ reinforced concrete pipe
  • 5,380 SY Base & Paving removed from site
  • 1,490 LF of Curb & Gutter removed from site