MUNICIPAL

Airports • Highways • Utilities • Sports • Schools

Airports • Highways
Utilities • Sports
Schools

Current Projects

Muscogee County School District, Elementary School No. 8

MCSD Elementary School No. 8 started in 2022 is an ongoing municipal development for the Muscogee County School District. Elementary School No. 8 designed by French & Associates, is located on Kennedy Street in Columbus, Georgia. ACCI is in the process of completing the sitework scope package which includes but is not limited to the

Project Details »
Current Projects

Connector Road

Connector Road started in 2022 is an ongoing municipal road project for the City of Auburn designed by SAIN Associates. Will Buechner Parkway is a new road project that will connect to MLK Drive near Webster Rd. and to Richland Rd. near Creekside Elementary in Auburn, Alabama. ACCI is in the process of completing the

Project Details »
Municipal

MCSD Athletic Complex

The Muscogee County School District Athletic Complex is a municipal development by Muscogee County School District designed by French & Associates. MCSD Athletic Complex is located in Columbus, Georgia. ACCI completed the sitework scope package which included but was not limited to the following: Site Clearing of approximately 18 acres 19,380 cubic yards of dirt

Project Details »
Municipal

Richland Road Widening

Richland Rd Widening was a municipal road project for The City of Auburn started in 2019. ACCI has completed the sitework scope package which included but was not limited to the following: Site Clearing of 3 acres 8,000 cubic yards of dirt moved on site Underground Utility Systems totaling approximately 300 LF of pipe Base

Project Details »
Municipal

Spencer High School

The Spencer High School project started development in 2016 as a joint venture between Freeman & Associates and Ra-Lin & Associates in Columbus, Georgia. ACCI completed the sitework scope package which included but was not limited to the following: • Site clearing of 26 acres• 18,000 cubic yards of dirt moved on site along with

Project Details »
Municipal

Beulah Park

Beulah Park is a sports plex development that was designed by Foresite Group. The job started in 2019 and has been completed. ACCI completed the sitework scope package which included but was not limited to the following: Site Clearing of 20 acres 65,900 cubic yards of dirt moved on site Underground Utility Systems totaling 2,876

Project Details »
Municipal

Cooper Creek Tennis Facility

Cooper Creek Tennis Facility is a 27 court and clubhouse addition developed by Brasfield & Gorrie in Columbus, Georgia in 2016. ACCI completed the sitework scope package which included but was not limited to the following: Graded 23 full size tennis courts and 4 junior courts Installed 5,200 square yards of sidewalk Underground Utility Systems

Project Details »
Municipal

Fire Tower Road

The Fire Tower Road project was a remediation development of an old landfill for Chattahoochee County in 2016. remediation of old landfill, removal of concrete debris, regrading of slope to prevent contamination and erosion, installed storm sewer system and methane observation system Acting as the primary contractor, ACCI executed the sitework scope which included but

Project Details »
Municipal

Forrest Road Improvements

Forrest Road Improvements was a road widening project that transformed a 2 lane road into a 3 lane road in 2016 for Columbus Consolidated Government. As the Prime Contractor, ACCI performed the following for the 2 mile widening project: Placed over 20,000 tons of graded aggregate base Replaced all water connections to over 100 homes

Project Details »
0
LF OF PIPE
0
ACRES CLEARED
0
YARDS OF DIRT MOVED
0
SQUARE YARDS OF PAVING, CURB, & SIDEWALK

“Balf oawiefaofi aifh weiuhf akefj woaefih awekfnaefawoefihawef alfaeoh;ohsselfgai lugfalj efbglaegfal.”

JOHN DOE
Construction Partner